Turnkey designer and builder of water treatment plants for upstream oil and gas markets

Category: Process Module OEM

Project scope

  • Source highly engineered valves from eight different global factories on three continents
  • Stringent specification, construction materials, and technical documents approval
  • Design verification of the actuation system
  • Ensure design approval from multiple parties, including end-user, EPC design company, and module builder
  • Client and third-party inspection in multiple manufacturing locations

Solution

We supplied manual and actuated 623 valves from eight factories – including emergency shut down valves (ESDVs) and motor operated valves (MOVs) – and managed multiple call-offs and order changes during the project. We also managed the project, integration, global logistics, inspections, and engineering requirements.

Impact

Project delivered fully compliant with specifications and within delivery window agreed with the client. Once again, by following our HSP Way principles, we ensured our solution was right first time, achieved zero NCR, and achieved the engineering changes required.  